Pre-commissioning, Commissioning & De-commissioning : Track Records

Year Scope of Work Project Description Location Client
2009 Gas Export (Trunkline - A) 24" x 1 GORA to BORF Bintulu Murphy Oil
2009 Dry Gas 20" x 1 GOPB to GORA Bintulu Murphy Oil
2009 Sales Gas 20" x 1 BORF to MLNG 111 Bintulu Murphy Oil
2009 Pigging and Hydrotest 6" x 7.1 KM Dulang - B to Dulang - D Terengganu TL Offshore Sdn Bhd / Petronas Garigali Sdn Bhd
2009 Deoiling 6" x 7.1 KM Dulang - B to Dulang - D Terengganu TL Offshore Sdn Bhd / Petronas Garigali Sdn Bhd
2009 Hydrotest 10" x 2.5 KM BOD to FSO Terengganu Talisman Energy
2009 Hydrotest 4" x 2.5 KM BOD to FSO Terengganu Talisman Energy
2009 Pigging and Hydrotest 6" x 4.6 KM BEKOK - B to BEKOK - A Terengganu TL Offshore Sdn Bhd / Petronas Garigali Sdn Bhd
2009 Pigging and Hydrotest 24" X 8 km M1DRA - JNDRA Bintulu TL Offshore Sdn Bhd / Petronas Garigali Sdn Bhd
2009 Pigging and Hydrotest 28" x 57KM F9JT - A to KAKG - A Bintulu TL Offshore Sdn Bhd / Petronas Garigali Sdn Bhd
2009 Pigging and Hydrotest 24" x 5 KM KAK - G to KASS - A Bintulu TL Offshore Sdn Bhd / Petronas Garigali Sdn Bhd
2009 Pigging and Hydrotest 18" x 21 KM KUJT - A to KAKG - A Bintulu TL Offshore Sdn Bhd / Petronas Garigali Sdn Bhd
2009 Pigging and Hydrotest 16" x 1.2 KM BADP - E to BADP - A Miri TL Offshore Sdn Bhd / Petronas Garigali Sdn Bhd
2009 Pigging and Hydrotest 6" x 1 KM SMJT - D to SMJT - C (PIPELINE 2) Labuan TL Offshore Sdn Bhd / Petronas Garigali Sdn Bhd
2009 Pigging and Hydrotest 6" x 1 KM SMJT - D to SMJT - C (PIPELINE 1) Labuan TL Offshore Sdn Bhd / Petronas Garigali Sdn Bhd
2009 Pigging and Hydrotest 10" x 21 KM BEP - A to BKP - A Miri TL Offshore Sdn Bhd / Petronas Garigali Sdn Bhd
2009 Pigging and Hydrotest 8" x 4.5 KM SMP - B to SMR - A Labuan TL Offshore Sdn Bhd / Petronas Garigali Sdn Bhd
2009 Pigging and Hydrotest 8" x 0.7 KM SMJT - C to SMJT - F Labuan TL Offshore Sdn Bhd / Petronas Garigali Sdn Bhd
2009 Pigging and Hydrotest 16" x 12 KM BKP - A to WLP - A Miri TL Offshore Sdn Bhd / Petronas Garigali Sdn Bhd
2008 Cleaning, Bulk Final 6" x 4.6KM BE - A to TA - B Terengganu Petronas Garigali Sdn Bhd (PMO)
2008 Deoiling, Cleaning and Bulk Final 6" x 7.1 KM DLB to DLD Terengganu Petronas Garigali Sdn Bhd (PMO)
2008 Flushing and Leak Testing PL 333 West Lutong Bakau Miri Petronas Garigali Sdn Bhd (SKO)
2008 Injection Pipeline Cleaning 8" x water GU - C to Gu - A Terengganu ExxonMobil (EMEPMI)
2008 Dewatering, Drying and N2 Packing 12" x 200 M KIKEH Labuan Petronas Garigali Sdn Bhd
2008 Pre Commissioning 12" x 0.902 KM BODP - B to BODP - C Gas Pipeline Miri Petronas Garigali Sdn Bhd (SBO)
2008 Pre Commissioning 12" x 22.178 KM PC4DP- A to B11DR-A GAS Pipeline Miri Petronas Garigali Sdn Bhd (SBO)
2008 Pigging and Hydrotesting 10" x 0.75 KM BODP - C to BODP - A Miri Petronas Garigali Sdn Bhd (SBO)
2008 Leak Test and Dewatering Pl 113 Samarang Labuan Petronas Garigali Sdn Bhd (SBO)
2008 Pigging N2 and Hydrotesting 8" x 1 KM PLET to PLEM Bintulu Swiber / Murphy Oil
2008 Flooding, Cleaning, Gauging, Hydrotesting, Dewatering and N2 Packing 24" x 36KM GO - RA to MGP - 1 LINE 2 Bintulu Swiber / Murphy Oil
2008 Flooding, Cleaning, Gauging, Hydrotesting, Dewatering and N2 Packing 24" x 36 KM GO - RA to MGP-I LINE1 Bintulu Swiber / Murphy Oil
2008 Flooding, Cleaning, Gauging, Hydrotesting, Dewatering and N2 Packing 20" x 4 KM GO - PB to GO - RA Bintulu Swiber / Murphy Oil
2008 Flooding, Cleaning, Gauging, Hydrotesting, Dewatering and N2 Packing 8" x 22 KM GO - RA to PLEM Bintulu Swiber / Murphy Oil
2008 Flooding, Cleaning, Gauging, Hydrotesting, Dewatering and N2 Packing 6" x 4 KM GO - PB to GO - RA Bintulu Swiber / Murphy Oil
2008 Flooding, Cleaning, Gauging, Hydrotesting, Dewatering and N2 Packing 6" x 2 KM WP - PB to WP - PA Bintulu Swiber / Murphy Oil
2008 Pre Comm and Flooding 14" x 6.7 KM E11K - A to SCDR -A Miri TL Offshore Sdn Bhd / Sarawak Shell Berhad
2008 Pre Comm and Flooding 12" x 5.2 KM F13 to F13W Miri TL Offshore Sdn Bhd / Sarawak Shell Berhad
2008 De Commissioning and Pre Commissioning Pl 129 8" x 1.8KM SMJT - C to SMP - A Gas Pipeline Labuan TL Offshore Sdn Bhd / Petronas Garigali Sdn Bhd
2008 De Commissioning and Pre Commissioning PL 110 8" x 1.8 KM SMJTC to SMP - A Gas Pipeline Labuan TL Offshore Sdn Bhd / Petronas Garigali Sdn Bhd
2008 De Commissioning and Pre Commissioning PL 109 8" x 1.8 KM SMJT - C to SMP - A Gas Pipeline Labuan TL Offshore Sdn Bhd / Petronas Garigali Sdn Bhd
2008 De Commissioning and Pre Commissioning PL 108 8" x 1.8 KM SMJT - C to SMP - A Gas Pipeline Labuan TL Offshore Sdn Bhd / Petronas Garigali Sdn Bhd
2008 Dewatering and N2 Packing 10" x 17.5 KM SUPG - B to SMG - A Gas Pipeline Labuan TL Offshore Sdn Bhd / Petronas Garigali Sdn Bhd
2008 Bulk Dewatering, Final Dewatering and N2 Purging 4" x 4.8 KM SUPG - B to SUJT - C Gas Pipeline Labuan TL Offshore Sdn Bhd / Petronas Garigali Sdn Bhd
2008 Cleaning and Final Dewatering 16" x 7.039 KM SUDP - AB to SUPG-B FWS Pipeline Labuan TL Offshore Sdn Bhd / Petronas Garigali Sdn Bhd
2008 Cleaning and Final Dewatering 12" x 6.955KM SUPG - B to SUDP - A WI Pipeline Labuan TL Offshore Sdn Bhd / Petronas Garigali Sdn Bhd
2008 Cleaning and Final Dewatering 10" x 20.7 KM BEP - A to BKP- A FWS Pipeline Miri TL Offshore Sdn Bhd / Petronas Garigali Sdn Bhd
2008 Cleaning and Final Dewatering 10" x 0.67 KM BOP- B to BODP- A FWS Pipeline Miri TL Offshore Sdn Bhd / Petronas Garigali Sdn Bhd
2008 Cleaning and Final Dewatering 12" x 0.902 KM BODP - B to BODP - C Gas Pipeline Miri TL Offshore Sdn Bhd / Petronas Garigali Sdn Bhd
2008 Cleaning,Final Dewatering and Nitrogent Packing 6" x 10.667 KM ANDR - A to ANDP - D GL Pipeline Terengganu TL Offshore Sdn Bhd / Petronas Garigali Sdn Bhd
2008 Cleaning,Final Dewatering and Nitrogent Packing 12" x 9.856 KM ANDR - A to ANDP - D FWS Pipeline Terengganu TL Offshore Sdn Bhd / Petronas Garigali Sdn Bhd
2008 Cleaning and Hydrotest 10" x 10.972 KM ANDR - A to ANDP - D Terengganu TL Offshore Sdn Bhd / Petronas Garigali Sdn Bhd
2008 Cleaning, Bulk and Final Dewatering 24" x 165 KM ANDR - A to TCOT Terengganu TL Offshore Sdn Bhd / Petronas Garigali Sdn Bhd
2008 Cleaning 10" x 51 KM J4DP- A to D35R-A Bintulu TL Offshore Sdn Bhd / Petronas Garigali Sdn Bhd
2008 Cleaning, Bulk and Final Dewatering 12" x 22 KM PC4DP- A to B11DR-A Miri TL Offshore Sdn Bhd / Petronas Garigali Sdn Bhd
2008 Cleaning, Gauging, Hydrotest and Dewatering 10" x 0.705 KM BOP- B to BODP-A FWS Miri TL Offshore Sdn Bhd / Petronas Garigali Sdn Bhd
2008 Pre - Flooding 10" x 51.3KM FWS D35R -A to J4DP-A Bintulu TL Offshore Sdn Bhd
2008 Dewatering 12" and 16" x 3.5 KM SUDPA to SUPG-B Labuan TL Offshore Sdn Bhd / Petronas Garigali Sdn Bhd
2008 Pre Commissioning 24" x Pre Commissioning ANDR- A to TCOT Terengganu TL Offshore Sdn Bhd / Petronas Garigali Sdn Bhd
2008 Dewatering 10" x 2 Pipeline Miri Mc Dermott
2008 Pre Commissioning 24" x 54 KM Pipeline From BRE-A to BO-D Terengganu Talisman Energy
2008 Deoiling 12" Pulai - Tapis Project Terengganu Petronas Carigali Sdn Bhd
2008 Deoiling Guntong - A to Guntong - C Terengganu ExxonMobil (EMEPMI)
2008 Pre Commissioning 8" Gas lift and 8" FWS Pre Commissioning Terengganu Swiber Marine (M) Berhad
2008 Deoiling, Dewatering, N2 Packing and Purging 12" x 8" Penara / Puteri / FPSO Terengganu Petronas Carigali Sdn Bhd (PMO)
2008 Hydrotesting and Leak Test Leak test 8" x 3.5 KM Guntong - C to Guntong -A Terengganu ExxonMobil (EMEPMI)
2008 Asist for IP Run Asist for IP Run at Samarang Field 2008 (3 Pipeline at Samarang Field) Labuan Petronas Carigali Sdn Bhd (Sabah Operation)
2008 Hydrotesting Hydrotesting for permanent to topside piping, pig luncher and receiver at SMJT- C,SMJTD and SMJT-F,Samarang Field Labuan Petronas Carigali Sdn Bhd (Sabah Operation)